Day 8: 6/1

 First day of June!

Things I need to do:

  • Design cylindrical holder and 3d print it (DONE)
  • Level the xyz robot
  • ask Xiaobing if the perovskites will degrade (is it just FTO and perovskites that will or is it the entire cell that will?
  • Ask who runs the nitrogen glove box
Based on the meeting with John and Likai, we might need to:
  • make our own dry box
  • store it in the dry nitrogen box
  • life cycle for 1000 hours
  • have it at 85 C for cycling
Interesting source I found for the cylindrical holder, in which I can add a spring: https://www.servomagazine.com/magazine/article/make-a-spring-loaded-pen-holder-for-your-cnc-router-for-5 

I designed the cylinder and tested multiple cylinder diameters out to get the right fit. I then made the cylinder thicker so I could drill a screw to pin the rods down, and 3D printed it.

Comments

Popular Posts